Specifications wood plastic composite
wpc decking,wpc flooring,wpc floor,wpc board,
free formula to make wpc production wood plastic composite
Model | YF180 | YF300 | YF600 | YF800 | YF1000 |
Max.width of product(mm) | 180 | 300 | 600 | 800 | 1000 |
Extruder mode | SJZ51/105 | SJZ65/132 | SJZ80/156 | SJZ80/156 | SJZ92/188 |
Extrusion capacity(kg/h) | 150 | 180 | 360 | 360 | 600 |
Motor power(kw) | 18.5 | 37 | 55 | 55 | 110 |
Total length(m) | 18 | 22 | 26 | 28 | 32 |
n Composition
Item | Quantity |
SJSZ- XX Twin Screw Extruder with Automatic Feeding System | One set |
Die Mold & Stock Mold | One set |
Vacuum Calibrarion Table | One set |
Haul-off and Cutter Unit | One set |
Stacker | One set |
Electric Control System | One set |
Screw : Material of screw: 38CrMoAl ,Surface treatment: Nitriding processing, thickness: 0.6 ~ 0,8mm, Polishing Rotating speed (counter rotating): 1-34.7 rpm/min Barrel: diameter conical 65/132 ,Inner processing: nitrided with thickness: 0.6 ~ 0.8mm Heating zones: 4 ;Heating mode: Cast alumina + stainless steel covering
Main electric part supplier : Inverter: ABB or Hitachi or Schneider or Holip Contactor: Schneider Air Switch: Schneider Relay: Omron Temperature controller: RKC 2. YF240 Calibration platform
Exterior dimension: Lx W x H: 6000x1100x1000mm (adjustable) Vacuum pump: 4x5.5KW,Water pump: 2×4KW; Origin: Made in qingdao, China Three direction adjustment:Forward and Backward with 0.75 Kw motor,Range: ±1000mm Up and down, left and right manually adjusted;Range: up and down: ±150mm 3.Haul-off and cutter (combined)
Haul-off speed: 0-3m/min;Motor power: 5.5KW; Caterpillar width: 210mm; Caterpillar length: 2200mm;Pneumatic clamp; Cutter:Motor power: 2.2KW;Scrap collecting motor power: 1.5KW;Diameter of saw: 500mm; Cutting range: 200mm;With scrap collecting device; 4. Mould -accoring to customer sample or drawing
1. Wire/cables: wires/cables from customer’s general control cabinet to the main control cabinet for profile extrusion line; all electrical cable from the main control cabinet to each machine. 2. Water supply: main water pipeline supply and water pipes to machines. 3. Means for lifting the machines when unloading and positioning. 4.Total power installed: 95Kw;Actual power consumption percentage: 80%; 5. Water requirement 8-10T/h and water can be circulated by means of a water pool (built by customer); 6. Manpower requirement Max. Qty. of labors: 1-2 person;