Zhangjiagang Yongfang Plastic Machinery Co., Ltd.

PVC UPVC CPVCplastic pipe production machine / PVC UPVC CPVC pipe making machine price

Basic Information
    PVC Plastic Pipe Extrusion Machine / PVC Pipe Making Machine Price Process Flow: Material→Mixer→Forced feeding→Conical double screw extruder→Mould and calibrator→ Vacuum spray cooling tank→Printer→Haul-off unit→Cutter→Stacker Machine Desription: GF series plastic pipe production line is mainly used in the manufacture of pvc pipes with various diameters and wall thickness in the aspects of agricultureal and constructional plumbing, cable laying etc. This set is composed of the conical twin screw extruder,vacuum calibrating tank, haul-off, cutter, stacker or belling machine etc. The extruder and haul-off adopt the imported AC frequency control device. The vacuum pump and hauling motor employ superior goods. Haul-off different specifications, such as two caterpillars, three caterpillars, four caterpillars,six caterpillars etc. are designed for different requirements. It may choose the saw blade cutting type or the planetary cutting type. It is additionally attached with length measuring apparatus and thickness increasing device. Rigid pvc pipe production line are interested by most customers in recently years. PVC pipe production line will have a potential huge market in plastic machinery. This pvc pipe used widely, i.e water supply and drainage, liquid gas and oil transportation, sewage and building industry. Techincal Parameter:
Model              Screw Diameter(mm) Pipe Range(mm) Capacity(kg/hr) Main motor power(kw) Total power Line length(m)
U-PVC63 51/105 16-63 80-120 18.5 50 22
U-PVC160 65/132 75/160 200-250 37 100 22
U-PVC250 65/132 110/250 200-250 37 120 30
U-PVC315 80/156 160/315 300-400 55 200 30
U-PVC450 80/156 200/450 300-400 55 220 36
U-PVC630 92/188 315/630 400-600 90 350 42
FAQ: 1.Q: Are you trading company or manufacturer?    A: We are factory. 2. Q: How long is your delivery time?     A: Generally it is 10-15 days if the goods are in stock, or it is 25-35 days if the goods are not in stock. It is also according to               quantity. 3. Q: What is your terms of payment?     A : 30% T/T in advance, balance before shippment, or L/C.  Pictures: Packaging & Shipping: If you want more information, please feel free to contact us! Our factory is near Shanghai about 120km, welcome to you anytime. Email: salesyw@yofangg dot com Mob/whatsapp: +86-13912799539/13584498960    
Supplier Information
Zhangjiagang Yongfang Plastic Machinery Co., Ltd.
[ Jiangsu China ]
More > Other products from this company
Post Buying Request