rectifier transformer oil immersed transformer electrical transformer | |
1 | Rectifier transformers are widely used in electrolysis, electrochemical , driving, traction , static de-dusting ,DC power transmission fields where rectification power source is necessary. |
2 | A rectiformer is used for power supply of rectifying devices , most industrial DC power sources is transformed from an AC network via rectifying devices consisting of a rectiformer and a rectify. |
3 | It is widely used in electrolysis , electrochemical , traction , driving ,DC transmission , frequency conversion and rectified power source fields. |
4 | According to user’s requirements , the secondary winding phase difference can be designed to 30 ,15 ,7.5, for rectification of 6-phase, 12-phase,24-phase and 48-phase |
5 | Rectifier transformers are combined with a diode or thyristor rectifier. |
6 | The applications range from very large aluminum electrolysis to various small and medium size operations. |
7 | The transformers may have a built-in or separate voltage regulation unit for direct output regulation of diode rectifiers , and correspondingly a power factor improvement with a thyristor rectifiers. |
8 | Losses: No-load losses is fully comply with IEC standard requirements. |
9 | Oil tank with various kinds of structure and good appearance. |
Type | Rated Power (kVA) | Rated Voltage(V) | Connection Symbol | Weight(kg) | Overall dimension L×W×H(mm) | Gau ge (mm) | |||
Line side | Valve side | Active part | Oil | Total | |||||
ZHSK-2000/10 | 2000 | 10000 | 238 | Yy6y0 | 3230 | 1900 | 6800 | 2500×1980×2750 | 1070 |
ZHSK -2700/6 | 2700 | 6000 | 265 | Dy11y5Yyd0d6 | 4140 | 2840 | 9680 | 3100×2500×2500 | 1070 |
ZHSK -3000/10 | 3000 | 10000 | 79 | Dy11y5Yyd0d6 | 4380 | 3100 | 1090 | 3500×2780×2660 | 1505 |
ZHSK -3500/10 | 3500 | 10000 | 270 | Yy6y0 | 4430 | 4200 | 11880 | 3680×3150×2900 | 1505 |
ZHSZK -4000/35 | 4000 | 35000 | 280 | Yy6y0 | 6200 | 5700 | 15300 | 3400×2800×3300 | 1505 |
ZHSTK -6300/35 | 6300 | 35000 | 260 | Y/Z(±15°)y0y6 | 13800 | 12000 | 31500 | 4300×3000×3500 | 2000 |
ZHSFTK-8000/35 | 8000 | 35000 | 220 | Za(+7.5°)Z (±15°) y0y6 | 18300 | 14000 | 37400 | 4800×3800×4300 | 2000 |
ZHSFTK-8000/35 | 8000 | 35000 | 220 | Za(-7.5°)Z (±15°) y0y6 | 18300 | 14000 | 37400 | 4800×3800×4300 | 2000 |
ZHSFTK-10000/35 | 10000 | 35000 | 200 | Za(+7.5°)Z (±15°) y0y6 | 19800 | 15600 | 42000 | 5000×4000×4800 | 2000 |
ZHSFTK-10000/35 | 10000 | 35000 | 200 | Za(-7.5°)Z (±15°) y0y6 | 19800 | 15600 | 42000 | 5000×4000×4800 | 2000 |
ZHSFFK-16000/35 | 16000 | 35000 | 180 | Za(+7.5°)Z (±15°) y0y6 | 24000 | 20000 | 53000 | 5300×4200×4700 | 2× 2000 |
Rectifier transformer power transformer | ||
1)Low loss | 4)High efficiency | 7)Pretty outline and compact structure |
2)Low noise | 5)Easy maintenance | 8)100% guaranteed no leakage |
3)Operation reliability | 6)Low partial discharge | 9)Strong mechanical strength and short-circuit withstand ability |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan,and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testinng. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months gurantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of starndard you follow? |
A: | IEC, ANSI, CSA, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation,outline drawing,manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list,etc |
5. Q: | What is your normal wanrranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commissioningin user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |
8. Q: | Are you manufacturer or trading company? |
A: | Manufacturer and Trading company. |