furnace transformer electric arc furnace transformer electric transformer | |
1 | Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents. |
2 | Arc furnace transformers used for steel-smelting |
3 | including load ratio voltage regulator type, no-load voltage regulator type,and built-in reactor type |
4 | Blast furnace transformers used for semlting of iron alloy, silicides, calcium carbide |
5 | single phase, three phase, load ratio voltage regulator and no-load voltage regulator |
6 | All are energy-saving products with low power loss. |
7 | Furnace transformers cooling modes are self-cooling mode, forced water cooling mode. |
Type | Rated power | Connection symbol | Primary voltage
| Secondary Voltage | Regulation voltage step | short-circuit impedance(%) | No-load loss | On-load loss |
HSSPZ-1500/35 | 1500 | Yd11 | 35 | 290~157 | 10 | 5.5 | 2.6 | 23 |
HSSP-3200/35 | 3200 | D-Y,d0-11 | 35 | 240~138 | 4 | 7 | 5.3 | 41.1 |
HSSPK-3200/35 | 3200 | D-Y,d0-11 | 35 | 240~138 | 5 | 18.65 | 5.3 | 91.1 |
HJSSP-5000/35 | 5000 | Yd11 | 35 | 212~155 | 5 | 7.5 | 9.3 | 55 |
HJSSP-5500/35 | 5500 | Yd11 | 35 | 240~130 | 6 | 7 | 9.1 | 52.5 |
HJSSP-7000/35 | 7000 | Yd11 | 35 | 240~140 | 8 | 6.5 | 9.4 | 77 |
HJSSPZ-9000/35 | 9000 | Yd11 | 35 | 239~163 | 9 | 8.5 | 11.6 | 97 |
HSSP-9000/35 | 9000 | Yd11 | 35 | 320~180 | 8 | 6 | 11 | 116 |
HJSSPZ-10000/35 | 10000 | Yd11 | 35 | 260~188 | 9 | 8.5 | 17.2 | 187 |
HSSPZ-10000/35 | 10000 | Yd11 | 35 | 300~160 | 13 | 6.5 | 12 | 97 |
HSSPZ-12500/35 | 12500 | Yd11 | 35 | 250~150 | 9 | 9 | 19.7 | 134 |
HSSP-12500/35 | 12500 | Yd11 | 35 | 340~195 | 11 | 8 | 13.9 | 154 |
HSSP-15000/35 | 15000 | D-Y,d0-11 | 35 | 353~160 | 8 | 8 | 20 | 107 |
HSSPZ-16000/35 | 16000 | Yd11 | 35 | 375~200 | 15 | 7 | 16.4 | 16.1 |
HJSSPZ-16000/35 | 16000 | Yd11 | 35 | 310~190 | 13 | 7 | 19.2 | 195.6 |
HSSPZ-20000/35 | 20000 | Yd11 | 35 | 400~270 | 13 | 7 | 20.7 | 207.7 |
HJSSPZ-20000/35 | 20000 | Dd0 | 35 | 320~170 | 11 | 6.5 | 30.4 | 30.4 |
HSSPZ-25000/35 | 25000 | Yd11 | 35 | 509~302 | 13 | 7.5 | 28.5 | 28.5 |
HSSPZ No-load-tap-chaning Arc Furnace Transformer | ||
1)Low loss | 4)High efficiency | 7)Pretty outline and compact structure |
2)Low noise | 5)Easy maintenance | 8)100% guaranteed no leakage |
3)Operation reliability | 6)Low partial discharge | 9)Strong mechanical strength and short-circuit with |
Arc Furnace Transformer Introduction to Products | |
1 | Furnace transformers are separated with normal power transformer with its characteristic of massive secondary currents. |
2 | Arc furnace transformers used for steel-smelting |
3 | including load ratio voltage regulator type, no-load voltage regulator type,and built-in reactor type |
4 | Furnace transformers used for semlting of iron alloy, silicides, calcium carbide |
5 | Load ratio voltage regulator and no-load voltage regulator |
6 | All are energy-saving products with low power loss. |
7 | Transformers cooling modes are self-cooling mode, forced water cooling mode. |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan,and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testinng. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months gurantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of starndard you follow? |
A: | IEC, ANSI, CSA, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation,outline drawing,manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list,etc |
5. Q: | What is your normal wanrranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commissioningin user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |
8. Q: | Are you manufacturer or trading company? |
A: | Manufacturer and Trading company. |