Dongguan Helian Mould Co., Ltd.

Helian company zipper slider body 8-cavity precision mold

Basic Information
Helian company zipper slider body 8-cavity precision mold   Who We Are?   Dongguan Helian mould Co., Ltd. Who is specialist in zipper slider mold from 1992. Our company have two old company name, one is “Liangquan” from 1992 to 1997 year, the other is “ Shunhua” from 1998 to 2005 year, under the previous boss Mr. Chen who worked in “ Huashun” mould company from Taiwan. Then new company name “ Helian “ from 2006 to now, under the present boss Mr. Wang who work in “ Liangquan”, “ Shunhua” and “ Helian” from 1993 to now.   Why Choose Us?   1. With more than 24years zipper slider mould manufacturing experience.   2. With advanced mould processing equipment from America, Japan, Switzerland and Taiwan.   3. With intact mould producing line(R&D, Milling, Cutting, Drilling, Grinding, Manual and automatic carving, polishing, EDM, assembly, testing, etc.)   4. With excellent quality mould steel material, such as FDAC and DAC.   5. With high precision, the mould tolerance limits of 10 to 20 microns maximum.   6. With testing on mould, the mould testing must more than 1000shots before shipping.   7. With strictly inspecting, then supply the quality test report.   8. With famous zipper company partners, such as IDEAL, TONI, CCK, 3F, SBS, SAB, HOK, HSD, etc.   9. With the majority of professional staffs who work in our company more than 10years.   10. With quick lead time and pretty price. Product Description  Product Photos     Product Description  

Mould Item

Auto lock zipper slider body mould

M

LKM,HASCO,DME

Cavity/core material

FDAC, DAC ,S136, H13, etc.

Cavity Qty

2-24pcs

Gate

Submarine gate,side/edge gate

Mould Processing

Die casting mould

Tooling Machine

Hot chamber die casting machine

Design software

UG/CAD/PROE

Product Size

#1, #2 #3, #4, #5, #7, #8, #10, #12, #15, #18, #20, etc.

Product material

ZM1, ZM2, ZM3, ZM4, ZM6, ZM7, ZM7, ZA8, ZA12,

ZA27, Zamak 5 , Zamak 8, Zamak 3.etc

Product Surface finish

Electro-polish, Chrome plating, sandblasting, 

painting, powder coating, electrophoresis, etc.

Lead time

25-40days based on different products

Package

Wooden casescartons or as customized

Loading of Port

Shenzhen

  Company Information   Producing Flow     Producing Capacity     Company Profile     Customer Photos Packaging & Shipping  Packaging Shipping Our Services  1. Warranty:  If the new mould have quality problem, you can return to our company for free replacement or repair, and enjoy a lifetime maintenance, normal wear and tear mould parts( excluding mold core and mold nose) need to be replaced or repaired, you just need to remit the cost of fee.   2. Resource Introduce: If you need hot chamber die casting machine, zipper slider assembly machine, polishing machine and other zipper making machine, we can introduce some golden supplier to you, with excellent quality, pretty price and good after-service. FAQ   Q1: When can I get the quotation? A1: Usually you need to send below information, we will quote within 12 hours after we get it.  1) The zipper slider mold for which size slider. 2) The sample weight request per piece. 3) The zipper slider 2D, 3D drawing or samples. 4) Your die-casting machine mechanical drawings. 5) How many tons about your hot chamber die casting machine?   Q2: Can you help with the design? A2: Yes, we have a professional team having rich experience in zipper slider design and mould manufacturing. Just tell us your ideas, we will design and guarantee the zipper slider function when match the zipper chain..   Q3: Shall I need to prove the brand ownership ? A3: Normally, you need to supply a copy of brand authorization to us when you place an order. Otherwise, all pictures with brands which were mentioned in this article are just for reference, the trademark right is belong to our clients.   Q4: How long can I expect to get the sample? A4:  After you pay the deposit charge on mold and send us confirmed files, the samples will be sent after mold finished. Via express and arrived in 3-5 workdays.   Q5: What about the lead time for mass production? A5: Honestly, it depends on the order quantity, product type and the season you place the order. Generally speaking, we suggest that you start to inquire two months before the date you would like to get the products at your country.  
Q6: How to finish the mould order?     Q7: How to contact us? A6: Send your Inquiry Details in the Below, Click "Send" Now. You can also add my other chat methods as below:   Skype ID: kai911210 Whats App ID: 008615015280715  
Supplier Information
Dongguan Helian Mould Co., Ltd.
[ Guangdong China ]
More > Other products from this company
Post Buying Request