YDSING-YD-000112 Passed CE and ISO Full Automatic Metal L/U Purlins Roll Forming Machine Profile drawing We can also design L/U purlin machine according to your specific profile drawing. Flow chart
For your reference
Passive decoiler |
Max. width of coil can be loaded | 465mm |
Mandrel Nominal Dia | 280mm |
Inner diameter | 476-508mm |
Max.out diameter | 1600mm |
Feeding applcator |
Feeding roller | diameter is 76mm |
Material | 40CR steel, HRC48-52 |
Roll forming line |
No. of work station | 19 sets |
Required motor capacity | 15K.W |
Thickness of coil | 1.5-3.0mm |
Max. Roll shafts Dia | 76mm |
Roller material | #45 steel,double machining,quenched |
Transducer | Panasonic or Simens |
Transmission | Chain driving system |
Straightening unit |
Roll material | #45,double machining,quenched |
Straightening roller | 4 rollers |
Hydraulic cutting |
Max.thickness | 3.0mm |
Cutting material | Cr12,quenched 58-62 |
Cutting system | Hydraulic die cutting |
Output table Stack the finished shutter slats according to your demands
Now, our products not only meeting the domestic demand, but also being exported to more than 80 countries and regions. For example: Asia: Indonesia,Malaysia,India,Saudi Arabia,United Arab Emirates,Pakistan,Iran,Vietnam, Korea,Kazakhstan,Iraq,Israel,Oman,Yemen,Syria,Philippines,Turkey,Uzbekistan… Europe:United Kingdom,Spain,Russia,Ukraine,Italy,Greece,Poland,Romania,Lithuania… Africa:South Africa,Zambia,Libya,Nigeria,Algeria,Egypt,Angola,Botswana South-America:Chile,Venezuela,Brazil,Columbia,Argentina… North-America:America,Trinidad and Tobago,Grenada,Nicaragua…
After-sale Serive The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. Training time: 5 days. Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Welcome to visit and order! Note:the machine can be re-designed according clients need