Wuxi Yuanding Science And Technology Co., Ltd.

YD-000170 Passed CE and ISO Full Automatic Cable Tray Machine,Cable Tray Roll Forming Machine, Cable Tray Making Machine

Basic Information
YD-000170  Passed CE and ISO Cable Tray Machine   Profile drawing   We can also design cable tray machine according to your specific profile drawing.         Complete Line Consist Of  

A - DECOILER..............................................................................................HYDRAULIC DECOILER

 

B -  LEVELLING MACHINE..........................................................................TO LEVELL MATERIAL

 

C - 200TONS'CAPACITY PRESS MACHINE......................................................TO PUNCH HOLES

 

D - HYDRAULIC PRE-CUTTING.......................................................TO CUTAT DESIRED LENGTH

  

E -  INFEEDER APPLICATOR..........................................................................TO GUIDE MATERIAL

 

F -  ROLL FORMING.............................................................ONE SIDE ADJUSTABLE FOR WIDTH

 

G - OUTPUT TABLE............................................................. SUPPORT THE FINISHED PRODUCTS

 

     
Specification
Number of Stations 20 sets
Thickness 0.5-2.0mm
Main Power 17.0KW
Shipment Packing one 40FT container
Forming Speed 20mtr./min(Not include shear)
Machine Frame H-BEAM Frame
   
Technical Data
Productivity Panel Shees as the Drawing
Man Power Required One Operator with One Assinstant
Set Up time 15 mins
Working Hours per Day 8 to 16
Line Direction Left to Right While Facing Operator Panel
Overall Machine Length Required 11.0M
Approximate Machine Height 1.6M
              Delivery Time     60-80days after receiving 30% deposit      Payment   40% paid by TT in advance and the balance paid by TT before shipping           Our Advantage   1)---High Quality 2)---Reliable  3)---Durable 4)---Reasonable Price 5)---Good after Service 6)---Passed ISO9001:2000 certification 7)---Passed CE certification               Now, our products not only meeting the domestic demand, but also being exported to more than 80 countries and regions. For example:   Asia: Indonesia,Malaysia,India,Saudi Arabia,United Arab Emirates,Pakistan,Iran,Vietnam,     Korea,Kazakhstan,Iraq,Israel,Oman,Yemen,Syria,Philippines,Turkey,Uzbekistan…   Europe:United Kingdom,Spain,Russia,Ukraine,Italy,Greece,Poland,Romania,Lithuania…   Africa:South Africa,Zambia,Libya,Nigeria,Algeria,Egypt,Angola,Botswana   South-America:Chile,Venezuela,Brazil,Columbia,Argentina…   North-America:America,Trinidad and Tobago,Grenada,Nicaragua…      After-sale Serive: The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. Training time: 5 days. Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)    Welcome to visit and order!    Note:the machine can be re-designed according clients need!
Supplier Information
Wuxi Yuanding Science And Technology Co., Ltd.
[ Jiangsu China ]
More > Other products from this company
Post Buying Request