Wuxi Yuanding Science And Technology Co., Ltd.

19 Stations Double Layer Forming Machine with Passive / Hydraul Single or Double Uncoiler

Basic Information
Double Layer Roll Forming Machine  
Number of stations 24 sets
Thickness 0.3-0.8mm
Main power 23.5KW
Shipment packing one 40FT container
Forming speed 20mtr./min(Not include shear)
Machine frame H-BEAM frame
 

Complete Line Consist Of

 

Passive uncoiler
Infeeding applicator
Roll forming machine unit
Hydraulic shear
Output table
    Technical Data
Productivity   panel sheets as the drawing
Man power required One operator with one assistant
Set up time 15 mins
Working hours per day 8 to 16
Line direction Left to right while facing operator panel
Overall machine length required 12.6M
Approximate machine height 1.5M
              After-sale Serive The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. Training time: 5 days. Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.) Welcome to visit and order! Note:the machine can be re-designed according clients need!
Supplier Information
Wuxi Yuanding Science And Technology Co., Ltd.
[ Jiangsu China ]
More > Other products from this company
Post Buying Request