Wuxi Yuanding Science And Technology Co., Ltd.

pipe roll forming machine with PLC control and hydraulic station

Basic Information
Specifications Pass CE authentication

Pass ISO authentication

PCL control:Panasonic or Simens

Payment:T/T

Specification
Number of Stations 23 sets
Thickness 0.3-1.0mm
Main Power 5.5KW
Shipment Packing one 40FT container
Forming Speed 15-18mtr./min(Not include shear)
Control system SImens PLC
Machine Frame H-BEAM Frame
   
Technical Data
Productivity Downspout as the drawing
Man Power Required One operator with one assinstant
Set Up time 15 mins
Working Hours per Day 8 to 16
Line Direction Left to Right While Facing Operator Panel
Overall Machine Length Required 15m
Approximate Machine Height 1.3M
   
Complete Line Consist Of(working process)
Decoiling
Coil sheet guiding&feeding
Roll forming
Cut to length
Output table
                      Delivery Time:   70 days after receiving 30% deposit     Payment:   30% paid by TT in advance and the balance paid by TT before shipping     Our Advantage:   1)---Our Tile Machine with High Quality 2)---Reliable  3)---Durable 4)---Reasonable Price 5)---Good after Service 6)---Passed ISO9001:2000 certification 7)---Passed CE certification     Now, our products not only meeting the domestic demand, but also being exported to more than 80 countries and regions. For example: Asia: Indonesia,Malaysia,India,Saudi Arabia,United Arab Emirates,Pakistan,Iran,Vietnam,     Korea,Kazakhstan,Iraq,Israel,Oman,Yemen,Syria,Philippines,Turkey,Uzbekistan…  Europe:United Kingdom,Spain,Russia,Ukraine,Italy,Greece,Poland,Romania,Lithuania… Africa:South Africa,Zambia,Libya,Nigeria,Algeria,Egypt,Angola,Botswana South-America:Chile,Venezuela,Brazil,Columbia,Argentina… North-America:America,Trinidad and Tobago,Grenada,Nicaragua…         After-sale Serive: The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. Training time: 5 days. Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.) Wuxi Yuanding Science and Technology Co., Ltd is located in Wuxi-the home of cold roll forming machine. Warmly welcome to visit our factory in any time! Our main products as below:   1. Tile roll forming machine 2. Top hat roll forming machine 3. Roof and wall panel roll forming machine 4. Shutter slat roll forming machine 5. Highway guardrail roll forming machine 6. C/Z/U/W/L Purlin roll forming machine 7. Sandwich panel roll forming machine 8. Grape frame roll forming machine 9. Ridge cap roll forming machinery  10.Metal deck roll forming machine and so on......    Welcome to visit and order!   Note:the machine can be re-designed according clients need!
Supplier Information
Wuxi Yuanding Science And Technology Co., Ltd.
[ Jiangsu China ]
More > Other products from this company
Post Buying Request