Passed CE and ISO YTSING-YD-0640 Gutter Roll Forming Machine
Thickness | 0.5-0.9mm |
Coil material | CR12, CNC lathesquenched 58-62 |
Coil weight | 3000kg |
Coil width | 300mm |
Complete Line Consist Of(working process) |
Passive decoiler |
Infeeding applicator |
Roll forming machine unit |
Hydraulic shear |
Output table |
![](https://bsg-i.nbxc.com/uploads/ee/0f/9c/9fb6530f88b7a69c3eddc14c02.jpg)
Infeeding applicator
![](https://bsg-i.nbxc.com/uploads/93/0f/83/55c9452b792b85a7fd23f5206d.jpg)
\
![](https://bsg-i.nbxc.com/uploads/6b/7f/ef/74822b77dcb90f09d870ee19d3.jpg)
About our company and factory
![](https://bsg-i.nbxc.com/uploads/c7/71/f2/1ba11bf9ebd5f3e457bb2d6c3b.jpg)
Our advantage, 1.We can produce the cold roll forming machine according to customers final products and requirements. 2.We are focusing on the reputation.The after-sales service can be assured.Engineer are available to service machinery overseas. 3.We are focusing on the quality of the machine, and all of our products got CE, ISO, SGS certifications. 4.The price is reasonable.We as the manufacturer can provide you the high quality machines with the most competitive price.
![](https://bsg-i.nbxc.com/uploads/e2/26/bc/e1f06a997c4346ffd4100bfc84.jpg)
![](https://bsg-i.nbxc.com/uploads/00/77/71/719874be3ee4a78a72692e4274.jpg)
Now, our products not only meeting the domestic demand, but also being exported to more than 80 countries and regions. For example:
![](https://bsg-i.nbxc.com/uploads/e5/6f/66/5042350bc234a00744d9f66d02.jpg)
http://wxytsing.en.alibaba.com/ r After-sale Serive -The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. -Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. -Training time: 5 days. -Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.) http://wxytsing.en.alibaba.com/ http://wxytsing.en.alibaba.com/ http://wxytsing.en.alibaba.com/