Wuxi Yuanding Science And Technology Co., Ltd.

Passed CE and ISO YTSING-YD-6755 Automatic Control Highway Guard Rail Roll Forming Machine for Sale

Basic Information
Passed CE and ISO YTSING-YD-6755 Automatic Control Highway Guard Rail Roll Forming Machine for Sale     The highway guardrail roll forming machine can be designed as two or three wave profiles in one machine, you just need to add some stations at the end of the machine. The products of the guardrail roll forming machine are used guardrails for the both sides of the highway.     Profile Drawing     We can design the machine according to your special profile drawings.     Flow Chart        Specifications   
Technical Data & Specification
Max.width of coil can be loaded 500mm
Man Power Required One operator with one assinstant
Set Up time 15 mins
Working Hours per Day 8 to 16
Material of roller 40CR steel,HRC48-52
Thickness of coil 3.5mm
Main Power 7.5 KW
Leveling roller Up is 3 rollers,down is 4 stations
Diameter of leveling roller  110mm
Line Direction Left to Right While Facing Operator Panel
Mandrel nominal dia 100mm
Approximate Machine Height 1.5M
Cutting system Hydraulic die cutting
Transducer Panasonic
Transmission By gear box:200*500
Max.roll shaft dia 100mm
   
Complete Line Consist Of(working process)
Passive decoiler
Infeeding applicator
Punching holes
Roll forming
Hydraulic shear
Output table
         Details of machine and conponents                    
                       PAYMENT   30% paid by TT in advance and the balance paid by TT before shipping   AFTER SALE SERVICE   - The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. - Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. - Training time: 5 days. - Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)   Welcome to contact wiht us and visit our factory!
Supplier Information
Wuxi Yuanding Science And Technology Co., Ltd.
[ Jiangsu China ]
More > Other products from this company
Post Buying Request