PU Sandwich Production Line
Specification |
Number of Stations | 14 sets |
Thickness | 0.8-1.2mm |
Main Power | 5.5KW |
Shipment Packing | one 40FT container |
Forming Speed | 10-20mtr./min(Not include shear) |
Machine Frame | H-BEAM Frame |
Technical Data |
Productivity | PU foam shutter slat as the drawing |
Man Power Required | One operator with one assinstant |
Set Up time | 15 mins |
Working Hours per Day | 8 to 16 |
Line Direction | Left to right while facing operator panel |
Overall Machine Length Required | 5.6M |
Approximate Machine Height | 1.0M |
Complete Line Consist Of |
Decoiler |
Roll forming |
Fomaning&Heating machine |
Cutting unit |
PLC automatic control cabinet |
Product run out table/Auto-Stacker |
We can also design PU sandwich panel roll forming machine according to your specific profile drawing. Picture
Delivery Time: 90 days after receiving 30% deposit Payment: 30% paid by TT in advance and the balance paid by TT before shipping Our Advantage: 1)---High Quality 2)---Reliable 3)---Durable 4)---Reasonable Price 5)---Good after Service 6)---Passed ISO9001:2000 certification 7)---Passed CE certification
Now, our products not only meeting the domestic demand, but also being exported to more than 80 countries and regions. For example: Asia: Indonesia,Malaysia,India,Saudi Arabia,United Arab Emirates,Pakistan,Iran,Vietnam, Korea,Kazakhstan,Iraq,Israel,Oman,Yemen,Syria,Philippines,Turkey,Uzbekistan… Europe:United Kingdom,Spain,Russia,Ukraine,Italy,Greece,Poland,Romania,Lithuania… Africa:South Africa,Zambia,Libya,Nigeria,Algeria,Egypt,Angola,Botswana South-America:Chile,Venezuela,Brazil,Columbia,Argentina… North-America:America,Trinidad and Tobago,Grenada,Nicaragua…
After-sale Serive: The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. Training time: 5 days. Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
Welcome to visit and order! Note:the machine can be re-designed according clients need!