YD-000480 Full Automatic Hydraulic High Quality Warehouse Pallet Storage Rack Roll Forming Machine Features The storage rack forming machine includes one decoiler, servo feeder, hole press, roll forming and hydraulic shear units. Application The products of the storage rack forming machine are used as racks and shelves for supporting the daily commodities in supermarkets and shops. Profile drawing We can also design storage rack formig machine according to your specific profile drawing.
![](https://bsg-i.nbxc.com/uploads/f2/74/8f/70c61ab580c2d38dbe763f42de.jpg)
The work flow
Complete Line Consist Of |
Decoiler |
Levelling machine |
80 tons' capacity press machine |
Infeeder applicator |
Roll forming |
Straightening unit |
Hydrualic shear |
Pneumatic output table |
Specification |
Number of Stations | 20-24 sets |
Thickness | 1.5-3.0mm |
Main Power | 18.5KW |
Shipment Packing | one 40FT container |
Forming Speed | 12mtr./min(Not include shear) |
Machine Frame | H-BEAM Frame |
Technical Data |
Productivity | As the drawing |
Man Power Required | One operator with one assinstant |
Set Up time | 15 mins |
Working Hours per Day | 8 to 16 |
Line Direction | Left to right while facing operator panel |
Overall Machine Length Required | 9.0M |
Approximate Machine Height | 1.2M |
![](https://bsg-i.nbxc.com/uploads/1c/b2/86/a7a05efa1e160f47e57c305600.jpg)
Now, our products not only meeting the domestic demand, but also being exported to more than 80 countries and regions...
![](https://bsg-i.nbxc.com/uploads/c1/d2/9c/cb6a5a8d39ac6d059d6d0ed0ef.jpg)
After-sale Serive: The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. Training time: 5 days. Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
![](https://bsg-i.nbxc.com/uploads/b7/6d/87/8ba080544527d6205fc91f008d.jpg)
Welcome to visit and order! Note:the machine can be re-designed according clients need!