Passed CE and ISO YTSING-YD-6632 PLC Control Roof Ridge Cap Roll Forming Machine Flow Chart
![](https://bsg-i.nbxc.com/uploads/c5/af/0a/d923a1ba7b7065002a8f008dcb.jpg)
We can design the machine according to your special profile drawings.
Complete Line Consist Of:
A - DECOILER...............................................................................................................PASSIVE DECOILER B - INFEEDER APPLICATOR....................................................................................TO GUIDE MATERIAL C - HYDRAULIC PRE- CUTTING.................................................................TO CUT AT DESIRED LENGT D - ROLL FORMING.........................................................................................TO ROLL ABOVE PROFILE E - OUTPUT TABLE........................................................................SUPPORT THE FINISHED PRODUCTS |
1.Passive decoiler:
Max. width of coil can be loaded | 500mm |
Mandrel face length | 550mm |
Max. weight of coil can be loaded | 3000 kg |
2.Feeding applicator:
Feeding roller diameter | 60mm |
Material | 40CR steel, HRC48-52 |
3. Hydraulic pre-cutting:
Hydraulic pressure | 16Mpa |
Thickness to be process | 0.3-0.8mm |
Cutting material | Cr12,quenched 58-62 |
Hydraulic power | 4.0 K.W |
Cutting system | Hydraulic die cutting |
4.Roll former:
No. of Work Station | 12sets |
Thickness to be process | 0.3-0.8mm |
Max. Roll shafts Dia | 60mm |
Max. Line Speed | 12-15mtr./min |
Required Motor Capacity | 5.5K.W |
Transducer | Panasonic |
Roller material | 4140 Nitrided |
Transmission | 1.0 '' inch chain driving |
Details of machine and components
![](https://bsg-i.nbxc.com/uploads/c7/71/f2/1ba11bf9ebd5f3e457bb2d6c3b.jpg)
PAYMENT 30% paid by TT in advance and the balance paid by TT before shipping AFTER SALE SERVICE - The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. - Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. - Training time: 5 days. - Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.) Welcome to contact with us and visit our factory!