Passed CE and ISO YTSING-YD-6656 Automatic PLC System Metal Stud and Track Roll Forming Machine
![](https://bsg-i.nbxc.com/uploads/be/26/82/e7e455e11f949b9c40e4f56446.jpg)
The stud and track roll forming machine produces studs and tracks.The products of the stud and track forming machines are widely used as the supporters in cellings,roofing,wall construction,etc. The whole line speed of thestud and track roll forming machine can be reached at 45m/min or more. If you need higher efficiency,we recommend you use the flying shear with non-stop. Profile drawings for your reference
![](https://bsg-i.nbxc.com/uploads/0f/d8/b3/b65e05775237376e8596a8e21b.jpg)
We can design the machine and flow chart according to your specific profile drawing.
Flow Chart
![](https://bsg-i.nbxc.com/uploads/71/84/fc/e688111e52d858ac1df3d4de17.jpg)
Specifications
Technical Data & Specification |
Man Power Required | One operator with one assinstant |
Set up time | 15 mins |
Working Hours per Day | 8 to 16 |
Number of Stations | 14 sets(as profile drawing) |
Thickness | 0.3-1.2mm |
Main Power | 7.5 KW |
Shipment Packing | one 40 FT containe |
Forming Speed | 15-45m/min |
Line Direction | Left to Right While Facing Operator Panel |
Complete Line Consist Of(working process) |
Decoiler |
Feeding applicator |
Roll forming unit |
Hydraulic cutting |
Output table |
Details of machine
![](https://bsg-i.nbxc.com/uploads/39/59/cc/5d7136684fe325c336bea1126c.jpg)
Sample
![](https://bsg-i.nbxc.com/uploads/b2/65/79/4908ef971b1632fead0557695f.jpg)
About our company
![](https://bsg-i.nbxc.com/uploads/6b/7f/ef/74822b77dcb90f09d870ee19d3.jpg)
Payment terms and after-sale service PAYMENT 30% paid by TT in advance and the balance paid by TT before shipping AFTER SALE SERVICE - The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. - Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. - Training time: 5 days. - Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. -The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.) We welcome you to visit our factory and we hope the cooperation with you sincerely!