Wuxi Yuanding Science And Technology Co., Ltd.

YTSING-YD-4010 Passed CE/ISO/SGS/ ISO Z Purlin Roll Forming Machine, Metal Z Purlin Making Machinery

Basic Information
Specifications Z Purlin Roll Forming Machine

Passed CE/ISO certification

More professional, economic

Payment:TT

  YTSING-YD-4010 Passed CE/ISO/SGS/ ISO Z Purlin Roll Forming Machine, Metal Z Purlin Making Machinery    

Complete Line Consist Of(working process)

Passive decoiler

Infeeding applicator

Roll forming machine unit

Straightening unit

Hydraulic shear

Output table

 
       

Technical Data & Specification

Productivity

Tiles as the drawing

Man Power Required

One operator with one assinstant

Set Up time

20 mins

Working Hours per Day

8 to 16

Number of Stations

23 sets

Thickness

1.5-3.0mm 

Main Power

19.0 KW

Shipment Packing 

one 40 FT containe

Forming Speed

15mtr./min

Line Direction

Left to Right While Facing Operator Panel

Overall Machine Length Required

8.3m

Approximate Machine Height

1.5M

         
     OUTPUT TABLE   Stack the finished products according to your demands.                                   Now, our products not only meeting the domestic demand, but also being exported to more than 80 countries and regions. For example: Asia: Indonesia,Malaysia,India,Saudi Arabia,United Arab Emirates,Pakistan,Iran,Vietnam, Korea,Kazakhstan,Iraq,Israel,Oman,Yemen,Syria,Philippines,Turkey,Uzbekistan… Europe:United Kingdom,Spain,Russia,Ukraine,Italy,Greece,Poland,Romania,Lithuania… Africa:South Africa,Zambia,Libya,Nigeria,Algeria,Egypt,Angola,Botswana South-America:Chile,Venezuela,Brazil,Columbia,Argentina… North-America:America,Trinidad and Tobago,Grenada,Nicaragua…         After-sale Serive The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated. Stud and Track Roll Forming Machine Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories. Training time: 5 days. Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility. The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
   If any inquiry, please feel free to contact us.       We shall be more than pleased to do what we can do for you.        
Supplier Information
Wuxi Yuanding Science And Technology Co., Ltd.
[ Jiangsu China ]
More > Other products from this company
Post Buying Request